XD 3 Protect Set - fire department
red roof / black tubes / red walls more
Product information "XD 3 Protect Set - fire department"
red roof / black tubes / red walls
Produktdetails "XD 3 Protect Set - fire department"
Set-up time: approx. 90 sec (compressed air cylinder) / 8 min (electric pump) / 10 min (hand pump) Compressed air coupling: female for hose diameter 9mm; nominal width 7.2mm
SPECIFICATIONS*
Side length: 9,8 ft 3,0 m
Entrance height: 6,6 ft 2,0 m
Total height: 8,8 ft 2,70 m
Tube diameter: 0,66 ft 0,2 m
Covered area: 60,3 ft² 5,6 m²
Weight: 19,6 lb 8,9 kg
Setup time with electric pump: 8 min
*all dimensions are approximate
Hint!
Cookie preferences
This website uses cookies, which are necessary for the technical operation of the website and are always set. Other cookies, which increase the comfort when using this website, are used for direct advertising or to facilitate interaction with other websites and social networks, are only set with your consent.
Configuration
Technically required
These cookies are necessary for the basic functions of the shop.
Accepted subshop popups
Allow all cookies
CSRF token
Cookie preferences
Currency change
Customer recognition
Customer-specific caching
Decline all cookies
Individual prices
Selected shop
Session
Comfort functions
These cookies are used to make the shopping experience even more appealing, for example for the recognition of the visitor.
Note
Statistics & Tracking
Affiliate program
Track device being used
Viewed